000 01345nam a2200253 a 4500
003 AR-BaIUDP
005 20250131100259.0
008 920205s1992 njua b 001 0 eng d
020 _a0135141753
020 _a9780135141755
040 _aAR-BaIUDP
_bspa
_cAR-BaIUDP
082 0 0 _a658.5
100 1 _aHarrison, Alan,
_d1944-
245 1 0 _aJust-in-time manufacturing in perspective /
_cAlan Harrison.
260 _aEnglewood Cliffs, N.J. :
_bPrentice Hall,
_c1992.
300 _axiii, 277 p. :
_bil. ;
_c24 cm.
490 1 _aManufacturing practitioner series
504 _aIncluye referencias bibliográficas (p. 271-272) e índice.
520 _a"This work is a practical guide to "just in time" techniques, examining principles and practice, pitfalls and implementation. The book is supported by a number of case studies, and adopts an international perspective, drawing upon US, European and Japanese experience. The book is intended to be a useful aid to engineers and managers in manufacturing and production, and for use on undergraduate courses in introduction engineering and industrial engineering, management for engineers and others." --Descripción del editor.
650 7 _aGestión industrial.
_2unescot
650 7 _aAdministración de empresas.
_2unescot
830 0 _aManufacturing practitioner series.
942 _2ddc
_cBK
_n0
999 _c58
_d58